Manufacturing

One route through the plant, from goods-in to dispatch.

Production at Gazipur is organised as a single controlled route. Material enters against a specification and finished stock leaves only against a completed record.

Site
Gazipur, Dhaka Division
Scope
Processing, filling, packing
On site
QC, warehouse, dispatch
Basis
Written specifications
Production hall with conveyors and process equipment

Production flow

Seven stages, each with its own record.

No stage passes work forward on assumption. A deviation stops the batch at the stage where it was found.

How quality sits across this
  1. 01

    Receiving

    Ingredients and packaging arrive against a purchase specification. Vehicles, documents and consignments are checked before anything is accepted onto the site.

    Ingredient sacks and sealed drums in the raw material store
  2. 02

    Storage

    Accepted materials are stored by type and condition, segregated where required, and issued in date order.

  3. 03

    Preparation

    Materials are weighed and prepared to the batch record. Water used in production is treated on site.

    Water treatment and utility systems serving the plant
  4. 04

    Processing

    Batches are processed to fixed parameters. Deviations stop the batch rather than travel with it.

    Detail of stainless process equipment and valve manifold
  5. 05

    Filling and packaging

    Product is filled, sealed, coded and packed. Fill level, seal integrity and coding are checked through the run.

    Rotary filler running bottles on the beverage line
  6. 06

    Hold and release

    Finished stock is held until the required checks are complete and the batch record is signed off.

    Retained batch samples and instruments on a quality control bench
  7. 07

    Dispatch

    Released stock is picked, loaded and documented so each consignment can be traced back to its batch.

    Finished pallets staged at the dispatch bay for loading

Site controls

The plant holds a known state.

Hygiene, sanitation, utilities, pest control, maintenance and foreign body control are scheduled, recorded and verified. They are conditions of running, not periodic exercises.

Detail of stainless process equipment and valve manifold
Hygiene
Zoning, personal hygiene rules and controlled access to production areas apply to staff, contractors and visitors alike.
Sanitation
Cleaning is scheduled by area and equipment, recorded, and verified before production restarts.
Utilities
Water, steam, compressed air and refrigeration are maintained and monitored as part of the production system.
Pest control
A managed programme with defined monitoring points, inspection records and corrective action.
Maintenance
Planned maintenance on process and packaging equipment, with hygienic clearance before a line returns to production.
Foreign body control
Physical controls at defined points in the process, checked at set intervals and recorded.
Warehousing
Segregated storage by status and condition, stock rotation, and controlled release of finished goods.
Dispatch
Vehicle checks, load documentation and batch records that connect each delivery to its production run.

Warehousing and dispatch

Stock moves on status, not on space.

Finished goods are segregated by release status. Picking, loading and documentation keep every consignment tied to the batch that produced it.

Traceability and release
Palletised finished goods held in the warehouse
Finished pallets staged at the dispatch bay for loading

Capability

Need to know whether your product can run here?

Describe the product, the pack format and the volume. The technical review tells you plainly what the site can and cannot do.