Contract manufacturing
Production for other brands, run the way we run our own.
Same lines, same controls, same records. A requirement is assessed honestly before anything is quoted, and nothing runs commercially without an agreed specification.

Process
Six steps from enquiry to dispatch.
Each step has an output. If a step cannot be completed to specification, the work stops there instead of moving forward on assumption.
- 01
Requirement
You describe the product, target market, volume and timing. We tell you plainly whether it fits the site.
- 02
Technical review
Formulation, materials, process route and food-safety constraints are reviewed against the lines available.
- 03
Specification
A written specification fixes formulation, packaging, coding, shelf life and acceptance criteria.
- 04
Trial and validation
A trial run is produced and assessed against the specification before any commercial commitment.
- 05
Production
Commercial runs are scheduled with in-process controls and batch records against the agreed specification.
- 06
Release and dispatch
Batches are held until checks are complete, then released, documented and dispatched.

What fits, and what does not.
- Suits the site
- Shelf-stable beverages and packaged foods that fit the existing process route and pack formats.
- Needs review
- New formats, unusual materials or products requiring process steps the site does not currently run.
- Fixed before quoting
- Formulation, packaging, coding, shelf life and acceptance criteria are agreed in writing first.
- Not undertaken
- Work we cannot control to specification. We say so at the review stage rather than after a failed run.
Working arrangement
Who is responsible for what.
Clear division of responsibility prevents the gaps that cause failed runs and disputed batches.
See the production flow- You provide
- Product concept or formulation, brand artwork, label content, target market and required volumes.
- We provide
- Technical review, process route, production, in-process control, batch records and release.
- Agreed jointly
- Specification, packaging structure, coding format, shelf life, acceptance criteria and lead times.
- Documented throughout
- Trial results, batch records, test results and dispatch documentation for every commercial run.
Next step
Send the product, the volume and the timing.
Include the market it is intended for. We will tell you plainly whether the site fits and what the technical review would involve.